City of Tarpon Springs
Copyright © 2019 City of Tarpon Springs. Accessibility Site Map
Visit Greece Without Leaving Florida

Tarpon Springs Project Updates

General Project Update -November 15, 2019 City-Wide Grant Information - October 2019 Standard Details Standard Technical Specifications Right of Way Use Permit Form Annual General Right of Way Permit Form

Contact Information: (727) 942-5638, 324 East Pine St, Email: projectadmin@ctsfl.us

ANCLOTE RIVER DREDGE PROJECT Anclote River Dredge Project Update March 19, 2019 Update 12-6-2018 Update 8-2-2018 Update 7-13-2018 Update - 5-17-2018 Update on Federal Progress - Congressman Bilirakis 12-4-2017 Addendum to Job Growth Grant Funding Application Letter of Support - Congressman Bilirakis Florida Job Growth Grant Fund Application - July 25, 2017 Project Status Report 11-7-2016 Economic Impact Study - November 2016 Economic Impact Study Presentation - 11-15-2016 Update - 6-8-2017 Resolution 2017-24 with Cover Letters Letter to Governor Scott - June 14, 2017 Letter from the Pinellas Board of County Commissioners BECKETT BRIDGE PROJECT Pinellas County Project Overview Aesthetics Meeting Minutes - December 7, 2016 Aesthetics Meeting Presentation Aesthetics Meeting Minutes - March 1, 2017 Aesthetics Meeting - May 10, 2017 U.S. Coast Guard Public Notice - May 20, 2019 CEDAR STREET IMPROVEMENT PROJECT If you are interested in receiving text message updates on this project, text CEDAR to 43506 Cedar Street Information Letter Cedar Street Final Plans CUTURAL CENTER RENOVATIONS If you are interested in receiving text message updates on this project, text CULTURAL to 43506 Project Description: The project consists of general exterior refurbishment of the historic Tarpon Springs Cultural Center. Project work will brick cleaning and repointing, wood trim refinishing, restoration of all 38 windows, wood exterior doors and trim refurbishment, roof repairs, hand rail replacement, and clock tower repairs. Cost estimate: $650,000 Estimated Projected Schedule (duration): 14 months Project Plans Specifications #1 Specifications #2 GROSSE AVENUE - PENT STREET STORM WATER DRAINAGE PROJECT Project Summary Public Meeting - Tuesday, November 19, 2019 from 6:00 - 8:00 pm at the City Hall Auditorium (324 E. Pine Street) HOPE STREET, ATHENS STREET AND GRAND BOULEVARD SIDEWALK AND CURB REPLACEMENT Contract Drawings LAKE TARPON SEWER PROJECT Lake Tarpon Sewer Project Presentation - King Engineering 4-20-2017 Project Information Pamphlet MARINA IMPROVEMENTS Final Plans RING AVENUE PARKING LOT AND PAVEMENT REHABILITATION Parking Lot Plans Brick Pavement Rehabilitation Plans SEABREEZE DRIVE SANITARY SEWER PROJECT Project Overview Seabreeze Drive Sanitary Sewer Project Map - Updated 10/10/2019 SPONGE DOCKS STORMWATER MASTER PLAN Athens Street and Dodecanese Boulevard Drainage Analysis (Phase 1) Project Summary: Phase 1: Check valves Scope: Installation of backflow preventer “tideflex” check valves at three outfall locations (Hope, Athens, Arfaras/Marina) that will reduce impact of street flooding during high tide events. Cost Estimate: $200,000 Funding source: Stormwater Utility/Penny for Pinellas Status: Project design is complete, currently out to bid for construction contract. Phase 2: Storm Pipe Upgrades Scope: Upgrade the storm sewer system by adding inlets and larger pipes to increase conveyance capacity. Cost Estimate: $630,000 Funding source: Undetermined Status: Conceptual design/analysis has been completed. Phase 3: Stormwater Storage (Vault) and Pumping Station Scope: Installation of a underground stormwater storage vault and pumping system to move water quickly off streets and away from structures. Requires completion of phases 1 and 2 to properly function. Installation would be in property owned by the City north of Dodecanese Blvd near Athens Street. Cost Estimate: $1,269,000 Funding Source: Undetermined Status: Conceptual design/analysis has been completed. SPRUCE STREET EXTENSION (FROM EAST OF HWY 19 TO JASMINE STREET) Spruce Street Resident Letter Construction Plans SOUTH SPRING BOULEVARD PEDESTRIAN ACCESS S. Spring Boulevard Right of Way Survey WESTWINDS & GRASSY POINTE RECLAIMED WATER DISTRIBUTION PROJECT Letter to Westwinds and Grassy Pointe Residents - Project Completion Notification May 17, 2019 Step by Step Guide for Setting Up Reclaimed Water Account Utility Availability Statement FDEP Reuse Flyer Reclaimed Water update: We are experiencing an overwhelming positive response to the new reclaimed water project. We really appreciate all the new customers who have initiated the process by signing up and setting up new reclaimed water accounts. Thank you for your continued patience as we process installation of the new meters and subsequent City inspection. Final Design Plans Project Update - April 13, 2018 Project Update #2 - August 2018 WASTEWATER / STORMWATER TASK FORCE INFORMATION Video: Stormwater and Sanitary Sewer Systems OTHER LINKS: Bayou District Information Meres Town Center Project Information
City of Tarpon Springs
Copyright © 2019 City of Tarpon Springs. Accessibility

Tarpon Springs Project

Updates

General Project Update -November 15, 2019 City-Wide Grant Information - October 2019 Standard Details Standard Technical Specifications Right of Way Use Permit Form Annual General Right of Way Permit Form

Contact Information: (727) 942-5638, 324 East Pine

St, Email: projectadmin@ctsfl.us

ANCLOTE RIVER DREDGE PROJECT Anclote River Dredge Project Update March 19, 2019 Update 12-6-2018 Update 8-2-2018 Update 7-13-2018 Update - 5-17-2018 Update on Federal Progress - Congressman Bilirakis 12-4-2017 Addendum to Job Growth Grant Funding Application Letter of Support - Congressman Bilirakis Florida Job Growth Grant Fund Application - July 25, 2017 Project Status Report 11-7-2016 Economic Impact Study - November 2016 Economic Impact Study Presentation - 11-15-2016 Update - 6-8-2017 Resolution 2017-24 with Cover Letters Letter to Governor Scott - June 14, 2017 Letter from the Pinellas Board of County Commissioners BECKETT BRIDGE PROJECT Pinellas County Project Overview Aesthetics Meeting Minutes - December 7, 2016 Aesthetics Meeting Presentation Aesthetics Meeting Minutes - March 1, 2017 Aesthetics Meeting - May 10, 2017 U.S. Coast Guard Public Notice - May 20, 2019 CEDAR STREET IMPROVEMENT PROJECT If you are interested in receiving text message updates on this project, text CEDAR to 43506 Cedar Street Information Letter Cedar Street Final Plans CUTURAL CENTER RENOVATIONS If you are interested in receiving text message updates on this project, text CULTURAL to 43506 Project Description: The project consists of general exterior refurbishment of the historic Tarpon Springs Cultural Center. Project work will brick cleaning and repointing, wood trim refinishing, restoration of all 38 windows, wood exterior doors and trim refurbishment, roof repairs, hand rail replacement, and clock tower repairs. Cost estimate: $650,000 Estimated Projected Schedule (duration): 14 months Project Plans Specifications #1 Specifications #2 GROSSE AVENUE - PENT STREET STORM WATER DRAINAGE PROJECT Project Summary Public Meeting - Tuesday, November 19, 2019 from 6:00 - 8:00 pm at the City Hall Auditorium (324 E. Pine Street) HOPE STREET, ATHENS STREET AND GRAND BOULEVARD SIDEWALK AND CURB REPLACEMENT Contract Drawings LAKE TARPON SEWER PROJECT Lake Tarpon Sewer Project Presentation - King Engineering 4-20-2017 Project Information Pamphlet MARINA IMPROVEMENTS Final Plans RING AVENUE PARKING LOT AND PAVEMENT REHABILITATION Parking Lot Plans Brick Pavement Rehabilitation Plans SEABREEZE DRIVE SANITARY SEWER PROJECT Project Overview Seabreeze Drive Sanitary Sewer Project Map - Updated 10/10/2019 SPONGE DOCKS STORMWATER MASTER PLAN Athens Street and Dodecanese Boulevard Drainage Analysis (Phase 1) Project Summary: Phase 1: Check valves Scope: Installation of backflow preventer “tideflex” check valves at three outfall locations (Hope, Athens, Arfaras/Marina) that will reduce impact of street flooding during high tide events. Cost Estimate: $200,000 Funding source: Stormwater Utility/Penny for Pinellas Status: Project design is complete, currently out to bid for construction contract. Phase 2: Storm Pipe Upgrades Scope: Upgrade the storm sewer system by adding inlets and larger pipes to increase conveyance capacity. Cost Estimate: $630,000 Funding source: Undetermined Status: Conceptual design/analysis has been completed. Phase 3: Stormwater Storage (Vault) and Pumping Station Scope: Installation of a underground stormwater storage vault and pumping system to move water quickly off streets and away from structures. Requires completion of phases 1 and 2 to properly function. Installation would be in property owned by the City north of Dodecanese Blvd near Athens Street. Cost Estimate: $1,269,000 Funding Source: Undetermined Status: Conceptual design/analysis has been completed. SPRUCE STREET EXTENSION (FROM EAST OF HWY 19 TO JASMINE STREET) Spruce Street Resident Letter Construction Plans SOUTH SPRING BOULEVARD PEDESTRIAN ACCESS S. Spring Boulevard Right of Way Survey WESTWINDS & GRASSY POINTE RECLAIMED WATER DISTRIBUTION PROJECT Letter to Westwinds and Grassy Pointe Residents - Project Completion Notification May 17, 2019 Step by Step Guide for Setting Up Reclaimed Water Account Utility Availability Statement FDEP Reuse Flyer Reclaimed Water update: We are experiencing an overwhelming positive response to the new reclaimed water project. We really appreciate all the new customers who have initiated the process by signing up and setting up new reclaimed water accounts. Thank you for your continued patience as we process installation of the new meters and subsequent City inspection. Final Design Plans Project Update - April 13, 2018 Project Update #2 - August 2018 WASTEWATER / STORMWATER TASK FORCE INFORMATION Video: Stormwater and Sanitary Sewer Systems OTHER LINKS: Bayou District Information Meres Town Center Project Information
Visit Greece Without Leaving Florida